Integrated Marine Informations System - IMIS

Personen | Instituten | Publicaties | Projecten | Datasets | Kaarten
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

Developing the transboundary Long Term Vision of the Scheldt Estuary – an untold story
Slinger, J.H. (2023). Developing the transboundary Long Term Vision of the Scheldt Estuary – an untold story. Water Int. 48(8): 1046-1067. https://dx.doi.org/10.1080/02508060.2023.2264668
Peer reviewed article  

Beschikbaar in  Auteur 

Author keywords
    Scheldt Estuary; boundary object; three-layer hybrid modelling; conceptual ecological model; transboundary decision-mak ing; vision development; Belgium; the Netherlands

Auteur  Top 
  • Slinger, J.H., meer

Abstract

    The development of the bilateral Long Term Vision for the Scheldt Estuary between 1999 and 2001 reveals that it is possible to move from a history of conflict to cooperation in just two years. A retrospective, insider perspective is used to analyse the integrated three-layer hybrid modelling at the heart of this groundbreaking agreement. We tell an untold story of the collaborative eco-morphological modelling activity that served as a boundary object supporting communication and contributing to a model-based metaphor of the intrinsic character of the estuary – its most lasting contribution.


Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteur