Integrated Marine Informations System - IMIS

Personen | Instituten | Publicaties | Projecten | Datasets | Kaarten
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

Challenges in the design of the New Lock Terneuzen
Aerts, F.; De Winne, K. (2015). Challenges in the design of the New Lock Terneuzen, in: SMART RIVERS 2015, Buenos Aires, Argentina, 7-11 September 2015: papers booklet. pp. [1-14]

Beschikbaar in  Auteurs 

Trefwoorden
    Design
    Sluizen van Terneuzen

Auteurs  Top 
  • Aerts, F., meer
  • De Winne, K.

Abstract
    The lock complex at Terneuzen is the most important gateway to the ports of Terneuzen and Ghent and provides a shipping link between the Netherlands, Belgium and France. The project team New Lock Ghent-Terneuzen of the Flemish-Dutch Scheldt Commission currently works full-speed in preparation for a new, large lock within the existing lock complex. On completion the new lock will rank among the ten largest locks in the world.

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs