Integrated Marine Informations System - IMIS

Persons | Institutes | Publications | Projects | Datasets | Maps
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [255613]
Vervolgonderzoek bevaarbaarheid Bovenzeeschelde: subreport 4 - Modelling Train CSM – ZUNO: validation 2013
Maximova, T.; Vanlede, J.; Verwaest, T.; Mostaert, F. (2016). Vervolgonderzoek bevaarbaarheid Bovenzeeschelde: subreport 4 - Modelling Train CSM – ZUNO: validation 2013. Version 3.0. WL Rapporten, 13_131. Flanders Hydraulics Research: Antwerp. VII, 27 + 76 p. appendices pp.
Part of: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , more

Available in  Authors 
Document type: Project report

Keywords
    Hydraulics and sediment > Hydrodynamics > Current velocities  and patterns
    Hydraulics and sediment > Hydrodynamics > Tides
    Numerical modelling
    Numerical models
    ANE, Scheldt Estuary [Marine Regions]
Author keywords
    DCSMv5; ZUNOv3

Project Top | Authors 
  • Vervolgonderzoek Bevaarbaarheid BoZS (Integraal Plan BoZs)

Authors  Top 

Abstract
    During last years Flanders Hydraulics Research (FHR) has developed hydrodynamic numerical models (2D) for the simulation of water levels and flow velocities in the Scheldt estuary and Belgian coastal zone. For this purpose a so called ‘model train’ is used where bigger models with a rougher grid resolution produce boundary conditions for smaller and finer models.

    This study describes the set up and validation of the first two models in this 'model train': CSM and ZUNO for year 2013. In the framework of the project 13_131 'Bevaarbaarheid van de Boven Zeeschelde' the navigability of the Scheldt estuary will be studied with the help of the detailed Telemac model. The boundary conditions for this model will be calculated with the ZUNO model.


All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors